Skip to main content

Eligibility & Fees

Eligibility for SEIRAN (project leader system), fees (300 GPU hours / ¥100,000), the CPU conversion rule, storage capacity and the application process.

On this page

Who can use SEIRAN

A faculty member or equivalent must serve as project leader (PL).

Project leader
The PL is responsible for application and project management, including the usage plan, member registration, and computing resources.
Students
Direct applications are not accepted. Please consult your faculty supervisor and participate as an approved project member.

Fees and GPU/CPU hour conversion

SEIRAN’s computing resources are provided as sets purchased per on-campus project.

Base allocation (GPU hours)
¥100,000
300 GPU hours / set
CPU time conversion rate
1/100
Drawn from the GPU allocation

How CPU time is converted

CPU usage is also charged. CPU hours are converted to GPU hours at 1/100 and deducted from the 300 GPU-hour base set.

Example: using 100 GPU hours and 1,000 CPU hours equals 110 GPU hours in total (100 + 1,000 ÷ 100).

Usage time is calculated from the wall-clock time a job allocated resources, not computing load or utilization. Idle or waiting time while resources are held counts as usage (similarly for CPU).

GPU hours are calculated as allocated GPUs × usage time (e.g., 4 GPUs × 75 hours = 300 GPU hours). Each job can use up to 4 GPUs as a rule (this is not a limit on concurrent project usage).
* Rounding and accounting units follow the official billing rules.

Estimate fees and allocation

Estimate GPU/CPU hours and additional storage costs for your research plan.

Fee & GPU/CPU hours calculator

Estimate consumption of a campus project allocation (1 set = 300 GPU hours / ¥100,000)

Estimate · minimum 1 set

The calculator is unavailable. Enable JavaScript and reload the page.

150 GPU hours
5,000 CPU hours

Counted at 1/100 of a GPU hour

+0 TB (3 TB total)

Estimate

Combined GPU-hour equivalent:
—

* GPU hours + (CPU hours ÷ 100)

Sets required:
—
Estimated total:
—

CPU accounting units, rounding, tax treatment, conditions for additional purchases and the billing period for additional storage follow the official billing rules.

Storage and retention

ItemSpecificationFee / notes
Standard storage3 TB per projectProvided per project
Additional storageExpandable in 1 TB units¥20,000 per TB
Data retentionPer academic year, as a ruleRetention, migration and deletion follow official guidance

Application and approval

  1. Application by the project leader

    The faculty PL organizes the usage plan (purpose, members, required hours, storage) and applies through the designated procedure.

  2. Review and approval

    Following application review, approved projects receive orientation and onboarding instructions.

  3. Account and authentication setup

    Set up multi-factor authentication (Cisco Duo) as instructed. Connection procedures are available in the onboarding materials.

Rules and security

Account management: Accounts are strictly for personal use; sharing is prohibited. Do not disclose Cisco Duo codes or SSH private keys, and never store or distribute SSH keys on SEIRAN servers or shared storage.

Job execution: Run computations via designated schedulers like Slurm; do not execute heavy workloads on login nodes.

Data and reporting: Manage research data in compliance with university regulations and submit required progress and outcome reports.

Frequently asked questions

What happens if we use up 300 GPU hours partway through the year?

The project leader should get in touch about additional use. Purchase and application conditions follow official guidance.

Can external collaborators be registered as project members?

SEIRAN is primarily for on-campus use. External use in connection with joint research with the university is considered case by case.

Can students apply directly?

No. A faculty (or equivalent) PL applies, and students take part as members of the approved project.

Are fees charged per person?

No, per project. One set is 300 GPU hours for ¥100,000, and CPU usage is added at 1/100.

Is CPU-only use charged?

Yes, CPU hours are charged. 1/100 of the CPU hours is counted as GPU hours.

Is 4 GPUs the limit for the whole project?

The rule is up to 4 GPUs per job. It is not a limit on how many GPUs the whole project can use at the same time.

How much storage is included?

3 TB per project as standard. It does not grow with the number of GPU-hour sets. Additional storage is ¥20,000 per TB.

Is data deleted at the end of the academic year?

Data is kept per academic year, as a rule. Follow official guidance for specific deletion dates and migration or continuation procedures.